June 22

A milestone — connecting to the 2nd 300 ft section of waterline.

We have since learned the hose clamps should be positioned with opposite pulls, but we’re not going to dig up the line to fix this. One of the many mistakes we have made, and hopefully this one is not too serious.

Another milestone — the up-flowing line from the spring-box separates from the down-flowing line to the cabin.

2 thoughts on “June 22”

  1. Is that Pex? Without any research before making this comment, should you have the Pex tool and use Pex rings. Surely you have researched “hose clamps underground life.”

Comments are closed.