August 31

Finally, we are on to the cistern. With help from Hunter and Steve, we got the base poured. Logan hauled the mixer/pump up to the cistern site with the excavator. Motion again!

The excavator hauled the mixer/pump up easily… once Logan figured out how to do it.

Steve and Hunter helped make the floor pour a smooth operation.